Skip to content
Home
Products
DOSIMETRY AND TELEMETRY SYSTEMS
PORTABLE INSTRUMENTS
RADIATION DETECTION SYSTEMS
MONITORING SYSTEMS
CONTAMINATION AND CLEARANCE MONITORS
CBRN AND MILITARY APPLICATIONS
Real time radiation monitoring
KITS AND ACCESSORIES
Services
Solutions
Electronic Dosimetry
Measure Radiation
Identify Radiation
Cyclotron and Industrial Area Monitoring
News & Events
About Us
Our Team
Contact
Home
Products
DOSIMETRY AND TELEMETRY SYSTEMS
PORTABLE INSTRUMENTS
RADIATION DETECTION SYSTEMS
MONITORING SYSTEMS
CONTAMINATION AND CLEARANCE MONITORS
CBRN AND MILITARY APPLICATIONS
Real time radiation monitoring
KITS AND ACCESSORIES
Services
Solutions
Electronic Dosimetry
Measure Radiation
Identify Radiation
Cyclotron and Industrial Area Monitoring
News & Events
About Us
Our Team
Contact
Search
Enquire
Dosimetry and Telemetry Systems
ConnectStudio™ – Connectivity Management Software for DMC 3000™ Dosimeters
Read More
DMC 3000 Personal Electronic Radiation Dosimeter
Read More
DMC 3000™ Beta Module Hp(0.07) – for the DMC 3000 Dosimeter
Read More
DMC 3000™ Bluetooth® Module – Connectivity Module for DMC 3000 Dosimeter
Read More
DMC 3000™ Telemetry Module – For the DMC 3000™ Dosimeter
Read More
DMCUser™ – Electronic Dosimeters Management and Maintenance Software
Read More
DosiCare™ – Operational Dosimetry Software Dedicated to Medical Environment
Read More
DosiServ™ – Dose Management Software
Read More
Enhanced Telemetry Module (eTx) – For the DMC 3000™ Dosimeter
Read More
LDM 1000™ – Enter or Exit Radialogical Controlled Area reader
Read More
LDM 3200™ – RCA Entry/Exit Reader
Read More
LDM 320D™ – Hands-Free Dosimeter Readers
Read More
LDM 320W™ – Hands-Free Dosimeter Readers
Read More
MirionWatch™ – Device for DMC 3000™ Bluetooth® Module
Read More
Neutron Module – For the DMC 3000™ Dosimeter
Read More
Neutron Telemetry Module (nTx) – For the DMC 3000™ Dosimeter
Read More
ARPS 2026 Email Brochures
Thank you for stopping by the Radtronics 2026 ARPS Booth.
Please enter your email:
(Required)
A download link containing all our 2026 brochures will be sent to the email entered above.
×
We use cookies to ensure that we give you the best experience on our website.
Ok